2017 Construction Project of Maxwell Road Bridge, Sabattus

The Maxwell Road Bridge is in need of replacement and will be under construction starting in March of 2017 through October 2017.  The Maxwell Road Bridge carries approximately 400 vehicles per day over the mainline of the Maine Turnpike.  Traffic will be routed around the site via a detour using Curtis Bog Road, Marsh Road, Sabattus Road (Route 126) and Litchfield Road (Route 197).  The detour as signed is approximately 6.5 miles long.

To read more about the project, please click here: 2017 Construction Project of Maxwell Road Bridge, Sabattus